Work is underway to build a new pedestrian crossing and path at Stafford Road next to Stafford Park.
Work is taking place between 7am to 5:30pm and is due to be completed by 17 March. A traffic detour is in place.
More information on the project can be found here:
https://at.govt.nz/about-us/have-your-say/north-auckland-consultations/stafford-road-northcote-point-raised-zebra-crossing
NOTE: The original proposal was to build a raised speed table, but after public consultation and change in government policy, the design was changed to a standard non-raised crossing.

Leave a Reply

Your email address will not be published. Required fields are marked *